ETL process scheduling - sample solution for Oracle SIMPLETASK
HEAP WORKFLOW
22-Sep-2008
Implementing ETL or ELT processes based on PL/SQL modules there is usually one important task in the queue - Schedule execution of atomic modules following internal dependencies and another rules. Enterprise-wide schedulers usually do not fulfill requirements of fine grain dependencies and rules, so they are often used as trigger of ETL batch managed by local ETL scheduler. Most of schedulers built-in into standard ETL tools are too static and rigid, not scaleable. Following solution I call SIMPLETASK, because it is simple by use method despite of teh powers it covers. Following sample is the BASIC version of the solution. Basic, to allow understand better the principle and to be easily included into simplier solutions like small ETL or migration processes.

Solution of the scheduling process come from the standard network graph task with resources. It is possible share a lot of methods with another solutions (Finding critical path etc.)

  • Heap (Batch) - defines closed group of processes run together driven by internal dependencies.
  • Task (Process) - defines atomic module to be run.
  • Predecessor - defines dependency between two modules, the second one should not be run before the first one is completed.
  • Exclusion - defines dependency between two modules, any of them should not be run when another process is in progress. (Note - in our solution exclusions are solved using resources)
  • Resource - defines limited resource consumed by running processes.
  • Resource consumption - defines consumption of resource by particular process.
  • Round (Run) - defines one cycle of execution, for example a processed day of daily process.

Example above shows dependencies between processes including both predecessor and exclusion types.
Example below substitutes exclusion dependency with resources. Resources allows either full exclusion (consumption 100%) or limit number of huge modules at the same time (consumption 50% allows processing up to 2 such processes).

See: More about the Heap Workflow principles you can read here


State Diagram of task in SIMPLETASK solution


D O W N L O A D    S I M P L E    S O L U T I O N
Following downloads, one for metadata structure and second one for PL/SQL packages, allow you to run your ETL or Data Migration tasks.
To install follow these steps:
  1. Create database user (e.g. BWTA_OWNER)
  2. Allow database space quota to store metadata (not extensive space required)
  3. Grant following privileges to the user:
    • CREATE SESSION
    • CREATE TABLE
    • CREATE TRIGGER
    • CREATE VIEW
    • CREATE SEQUENCE
    • CREATE JOB
    • CREATE PROCEDURE
    • EXECUTE ON DBMS_LOCK
  4. Install metadata structures running the first following script downoad
  5. Install packages running the second following script download
  6. Install views running the third following script download

Script: Create_BWTA_metadata_structure.sql

--------------------------------------------------------
--  DDL for Sequence BWTA_HEAP_SEQ
--------------------------------------------------------
   CREATE SEQUENCE  "BWTA_HEAP_SEQ"  MINVALUE 1 INCREMENT BY 1 START WITH 1 NOCACHE  ORDER  NOCYCLE;
--------------------------------------------------------
--  DDL for Sequence BWTA_LOG_ROUND_SEQ
--------------------------------------------------------
   CREATE SEQUENCE  "BWTA_LOG_ROUND_SEQ"  MINVALUE 1 INCREMENT BY 1 START WITH 1 NOCACHE  ORDER  NOCYCLE;
--------------------------------------------------------
--  DDL for Sequence BWTA_LOG_THREAD_SEQ

...more
Script: Create_BWTA_core_packages.sql

----------------------------------------------------------------------
-- PACKAGE BWTA_METADATA                                            --
----------------------------------------------------------------------
Create or replace PACKAGE "BWTA_METADATA" IS 
  ----------------------------------------------------------------------------- 
  --Purpose: Simple processes and task management / METADATA API             -- 
  --Author:  Bob Jankovsky, copyleft 2008, 2013                              -- 
  --History: 1.3 /22-JUN-2013 -- extracted from central utility and enhanced -- 
  --         1.4 /24-JUL-2013 -- new Rename methods                          -- 
  ----------------------------------------------------------------------------- 

...more
Script: Create_BWTA_core_views.sql

----------------------------------------------------------------------
-- View BWTA_V_ERR                                                  --
----------------------------------------------------------------------
CREATE OR REPLACE FORCE VIEW BWTA_V_ERR AS
SELECT 
 'ORA'||to_char(ID,'00000') as ID,
 ATMPT_CNT,
 DELAY_DAY*24*60 AS DELAY_MIN,
 PROLONG_KOEF,
 DIVERS_MOD

...more


M E T A D A T A    M O D E L


Metadata structure description:

BWTA_TASK_RES Relation between processes - predecessor specification
TASK_SEQ NUMBER 1 Sequence key of task
RES_SEQ NUMBER 2 Sequence key of resource
AMOUNT NUMBER O Consumption of specified resource by the process
BWTA_TASK_REL Relation between processes - predecessor specification
SEQ1 NUMBER 1 Sequence key of dependent task
SEQ2 NUMBER 2 Sequence key of the predecessor task
SKIP_FLAG NUMBER(1) O Skip flag to disable dependency
BWTA_TASK Process (task) to be run
SEQ NUMBER 1 Sequence key of task
HEAP_SEQ NUMBER M Sequence key of heap
ID VARCHAR2(100) M ID of process
NOTE VARCHAR2(500) O Description of task
EXEC_COND VARCHAR2(2000) O Condition code of execution to block task based on external condition
SKIP_COND VARCHAR2(2000) O Condition code of skip to skip task based on external condition
EXEC_FLAG NUMBER O Flag of execution to block task
SKIP_FLAG NUMBER O Flag of skip to skip task
EXEC_CODE VARCHAR2(2000) O Execution PL/SQL code
PRIORITY NUMBER M Priority of execution (less is more important)
AVG_DURATION NUMBER O Average duration of process based on statistics
CNT_DURATION NUMBER O Count of runs involved in statistics
BWTA_RES Resource definition
SEQ NUMBER 1 Sequence key of resource
ID VARCHAR2(100) O ID of resource
NOTE VARCHAR2(500) O Description of resource
AMOUNT NUMBER M Total amount of resource (e.g. 100 [%])
PENDING NUMBER(1) M 0..resource released after end of process, 1..resource should be released by negative consumption
BWTA_LOG_THREAD Thread of execution
SEQ NUMBER 1 Sequence key of thread
ROUND_SEQ NUMBER O Sequence key of round
STATUS VARCHAR2(10) O Status of thread (ACTIVE, INACTIVE, SLEEP)
TASK_SEQ NUMBER O Sequence key of active task for the ACTIVE status
START_DT DATE O Start date of current activity
COMMAND VARCHAR2(100) O command for thread - STOP to stop thread after current activity
ERROR_MSG VARCHAR2(2000) O Error message for the ERROR status
BWTA_LOG_TASK_H Process execution log
TASK_SEQ NUMBER O Sequence key of process
ROUND_SEQ NUMBER O Sequence key of round
STATUS VARCHAR2(10) O Status of process (ACTIVE, ERROR, DONE, SUSPEND, SKIP, WAIT)
START_DT DATE O Start date and time of process execution or time to wait for
END_DT DATE O End date and time of process execution
ERROR_MSG VARCHAR2(4000) O Error message for the ERROR status
TS TIMESTAMP(6) O Timestamp of the change
BWTA_LOG_TASK Process execution log
TASK_SEQ NUMBER 1 Sequence key of process
ROUND_SEQ NUMBER 2 Sequence key of round
STATUS VARCHAR2(10) O Status of process (ACTIVE, ERROR, DONE, SUSPEND, SKIP, WAIT)
START_DT DATE O Start date and time of process execution or time to wait for
END_DT DATE O End date and time of process execution
ERROR_MSG VARCHAR2(4000) O Error message for the ERROR status
BWTA_LOG_ROUND Round of the batch execution
SEQ NUMBER 1 Sequence key of round
HEAP_SEQ NUMBER M Sequence key of heap
EFFECTIVE_DATE DATE O Effective date of round
START_DT DATE O Start date and time of round
END_DT DATE O End date and time of round - indicates completed rounds
BWTA_LOG_METADATA
SEQ NUMBER 1 Primary key of changed record
SEQ2 NUMBER 2 Optional extension of key of changed record
DT TIMESTAMP(6) 3 Timestamp of realized change
OPERATION CHAR(1) 4 Operation (I,U,D)
OLD_VAL XMLTYPE O Old value of record XML element
NEW_VAL XMLTYPE O New value of record XML element
TAG VARCHAR2(100) O
TABLE_NAME VARCHAR2(30) M Table of the change
BWTA_LOG_ERR Log of all the realized failover actions
ROUND_SEQ NUMBER 1 Round when it happened
TASK_SEQ NUMBER 2 Sequence key of Task
ERR_ID NUMBER 3 Error ID
DT TIMESTAMP(6) 4 Timestamp when it happened
BWTA_HEAP Batch of processes to be run
SEQ NUMBER 1 Sequence key of batch, -1 is default one
ID VARCHAR2(100) O ID of batch
NOTE VARCHAR2(500) O Description of batch
STAT_ROUND_SEQ NUMBER M Last round the statistics has been gathered
BWTA_ERR Maintained errors
ID NUMBER 1 ORA error number
ATMPT_CNT NUMBER O Number of attempts
DELAY_DAY NUMBER O Delay specified as a fragment of day
PROLONG_KOEF NUMBER O Koefficient of prolongation of each next attempt
DIVERS_MOD NUMBER O Modulo used for diversification of particular processes


E X A M P L E

In following example of filling metadata we will use processes from the network graph above.
Begin DBMS_LOCK.sleep([duration]);end;  will be used instead of real modules to simulate duration of processes.

BEGIN 
     BWTA_METADATA.SETRES('R1','Resource 1 - target partition',100,0,'INIT'); 
     BWTA_METADATA.SETTASK('P1', 'Task1', 'begin DBMS_LOCK.sleep(120);end;', 50, 'INIT'); 
     BWTA_METADATA.SETTASK('P2', 'Task2', 'begin DBMS_LOCK.sleep(140);end;', 50, 'INIT'); 
     BWTA_METADATA.SETTASK('P3', 'Task3', 'begin DBMS_LOCK.sleep(250);end;', 50, 'INIT'); 
     ---- 
     BWTA_METADATA.SETTASK('P4', 'Task4', 'begin DBMS_LOCK.sleep(160);end;', 50, 'INIT'); 
       BWTA_METADATA.SETTASKREL('P4','P1',-1,0,'INIT'); --dependency P4 on P1 
       BWTA_METADATA.SETTASKREL('P4','P2',-1,0,'INIT'); --dependency P4 on P2 
     BWTA_METADATA.SETTASK('P5', 'Task5', 'begin DBMS_LOCK.sleep(100);end;', 50, 'INIT'); 
       BWTA_METADATA.SETTASKREL('P5','P3',-1,0,'INIT'); --dependency P5 on P3 
       BWTA_METADATA.SetTaskRes('P5',-1,'R1',100,'INIT'); --Task P5 requires resource R1 (amount 100) 
     ---- 
     BWTA_METADATA.SETTASK('P6', 'Task6','begin DBMS_LOCK.sleep(300);end;', 50, 'INIT'); 
       BWTA_METADATA.SETTASKREL('P6','P4',-1,0,'INIT'); --dependency P6 on P4 
       BWTA_METADATA.SetTaskRes('P6',-1,'R1',100,'INIT'); --Task P5 requires resource R1 (amount 100) 
     ---- 
     BWTA_METADATA.SetTask('P7', 'Task7', 'begin DBMS_LOCK.sleep(309);end;', 50, 'INIT'); 
       BWTA_METADATA.SETTASKREL('P7','P5',-1,0,'INIT'); --dependency P7 on P5 
       BWTA_METADATA.SetTaskRel('P7','P6',-1,0,'INIT'); --dependency P7 on P6 
    Commit; 
end; 

[Download]

Now we can start daily process using following command:


BEGIN 
  bwta_oper.startround(DATE'2008-08-22');
END;
/


Process is started in 5 parallel threads for an effective date 22-AUG-2008. We can operatively check execution from runtime metadata. Following list contains snapshots taken during the execution from the very start to the end. Column BLOCKING_TASKS hints what are particular tasks waiting for

SQL> SELECT 2 TASK_ID 3 , EFFECTIVE_DATE 4 , STATUS 5 , START_DT 6 , END_DT 7 , MINUTES 8 , AVG_MINUTES 9 , PREDECESSOR_TASKS 10 , BLOCKING_TASKS 11 FROM BWTA_V_LOG_TASK_WIDE 12 WHERE HEAP_SEQ=-1 13 / TASK_ID EFFECTIV STATUS START_DT END_DT MINUTES AVG_MINUTES PREDECESSOR_TASKS BLOCKING_TASKS -------------------- -------- ---------- -------- -------- ---------- ----------- -------------------- -------------------- P1 22.08.08 ACTIVE 29.06.13 ,133333333 2,03541667 P2 22.08.08 ACTIVE 29.06.13 ,05 2,33333333 P3 22.08.08 ACTIVE 29.06.13 ,033333333 4,16666667 P4 22.08.08 5,175 P1,P2 P1,P2 P5 22.08.08 1,675 P3 P3 P6 22.08.08 5 P4 P4 P7 22.08.08 5,15833333 P5,P6 P5,P6 SQL> r TASK_ID EFFECTIV STATUS START_DT END_DT MINUTES AVG_MINUTES PREDECESSOR_TASKS BLOCKING_TASKS -------------------- -------- ---------- -------- -------- ---------- ----------- -------------------- -------------------- P1 22.08.08 DONE 29.06.13 29.06.13 2,05 2,03541667 P2 22.08.08 DONE 29.06.13 29.06.13 2,33333333 2,33333333 P3 22.08.08 ACTIVE 29.06.13 2,55 4,16666667 P4 22.08.08 ACTIVE 29.06.13 ,233333333 5,175 P1,P2 P5 22.08.08 1,675 P3 P3 P6 22.08.08 5 P4 P4 P7 22.08.08 5,15833333 P5,P6 P5,P6 SQL> r TASK_ID EFFECTIV STATUS START_DT END_DT MINUTES AVG_MINUTES PREDECESSOR_TASKS BLOCKING_TASKS -------------------- -------- ---------- -------- -------- ---------- ----------- -------------------- -------------------- P1 22.08.08 DONE 29.06.13 29.06.13 2,05 2,03541667 P2 22.08.08 DONE 29.06.13 29.06.13 2,33333333 2,33333333 P3 22.08.08 DONE 29.06.13 29.06.13 4,16666667 4,16666667 P4 22.08.08 ACTIVE 29.06.13 2,01666667 5,175 P1,P2 P5 22.08.08 ACTIVE 29.06.13 ,166666667 1,675 P3 P6 22.08.08 5 P4 P4 P7 22.08.08 5,15833333 P5,P6 P5,P6 SQL> r TASK_ID EFFECTIV STATUS START_DT END_DT MINUTES AVG_MINUTES PREDECESSOR_TASKS BLOCKING_TASKS -------------------- -------- ---------- -------- -------- ---------- ----------- -------------------- -------------------- P1 22.08.08 DONE 29.06.13 29.06.13 2,05 2,03541667 P2 22.08.08 DONE 29.06.13 29.06.13 2,33333333 2,33333333 P3 22.08.08 DONE 29.06.13 29.06.13 4,16666667 4,16666667 P4 22.08.08 DONE 29.06.13 29.06.13 2,66666667 5,175 P1,P2 P5 22.08.08 ACTIVE 29.06.13 1,56666667 1,675 P3 P6 22.08.08 5 P4 P7 22.08.08 5,15833333 P5,P6 P5,P6 SQL> r TASK_ID EFFECTIV STATUS START_DT END_DT MINUTES AVG_MINUTES PREDECESSOR_TASKS BLOCKING_TASKS -------------------- -------- ---------- -------- -------- ---------- ----------- -------------------- -------------------- P1 22.08.08 DONE 29.06.13 29.06.13 2,05 2,03541667 P2 22.08.08 DONE 29.06.13 29.06.13 2,33333333 2,33333333 P3 22.08.08 DONE 29.06.13 29.06.13 4,16666667 4,16666667 P4 22.08.08 DONE 29.06.13 29.06.13 2,66666667 5,175 P1,P2 P5 22.08.08 DONE 29.06.13 29.06.13 1,66666667 1,675 P3 P6 22.08.08 ACTIVE 29.06.13 ,883333333 5 P4 P7 22.08.08 5,15833333 P5,P6 P6 SQL> r TASK_ID EFFECTIV STATUS START_DT END_DT MINUTES AVG_MINUTES PREDECESSOR_TASKS BLOCKING_TASKS -------------------- -------- ---------- -------- -------- ---------- ----------- -------------------- -------------------- P1 22.08.08 DONE 29.06.13 29.06.13 2,05 2,03541667 P2 22.08.08 DONE 29.06.13 29.06.13 2,33333333 2,33333333 P3 22.08.08 DONE 29.06.13 29.06.13 4,16666667 4,16666667 P4 22.08.08 DONE 29.06.13 29.06.13 2,66666667 5,175 P1,P2 P5 22.08.08 DONE 29.06.13 29.06.13 1,66666667 1,675 P3 P6 22.08.08 DONE 29.06.13 29.06.13 5 5 P4 P7 22.08.08 ACTIVE 29.06.13 ,133333333 5,15833333 P5,P6


S E C U R I T Y    A R C H I T E C T U R E


The most common tasks of the workflow management:

Monitoring of current processes:

SELECT
  TASK_ID
, EFFECTIVE_DATE
, STATUS
, to_char(START_DT,'DD.MM.YYYY HH24:MI:SS') AS START_DT
, to_char(END_DT,'DD.MM.YYYY HH24:MI:SS') AS START_DT
, END_DT
, MINUTES
, AVG_MINUTES
, PREDECESSOR_TASKS
, BLOCKING_TASKS
FROM BWTA_V_LOG_TASK_WIDE
WHERE HEAP_SEQ=-1
ORDER BY 
  CASE STATUS WHEN 'ERROR' THEN 1 
              WHEN 'SUSPEND' THEN 2
              WHEN 'ACTIVE' THEN 3
              WHEN 'DONE' THEN 5
              WHEN 'SKIP' THEN 5
              ELSE 4
  END 
, TASK_ID  


Error treatment the first column returns command to restart process

SELECT 'BEGIN BWTA_OPER.restartTask('''||TASK_ID||''');END;' as CMD
, ERROR_MSG
FROM BWTA_V_LOG_TASK_WIDE
WHERE status = 'ERROR'
ORDER BY START_DT 


List of threads of current round(s)

SELECT b.seq
, b.round_seq
, b.status
, TO_CHAR(d.start_dt, 'DD-MM-YYYY HH24:MI:SS') start_dt
, b.task_seq
, c.id
, b.command
, b.error_msg
FROM BWTA_LOG_THREAD B
LEFT JOIN BWTA_TASK C
ON B.TASK_SEQ = C.SEQ
LEFT JOIN BWTA_LOG_TASK d
ON d.task_seq = c.seq
  AND d.round_seq = b.round_seq
ORDER BY b.seq 

SEQ ROUND_SEQ STATUS START_DT TASK_SEQ ID COMMAND ERROR_MSG ---- ---------- ---------- ------------------- ---------- ------------ ----------------- -------------------- 46 20 ACTIVE 29-06-2013 16:49:24 13 P1 47 20 ACTIVE 29-06-2013 16:49:27 14 P2 48 20 INACTIVE 49 20 SLEEP 50 20 SLEEP


Number of processes by status (done, to be done, error)

WITH LRL AS
  (
    SELECT --+materialize
      HEAP_SEQ
    , MAX(SEQ) ROUND_SEQ
    FROM BWTA_LOG_ROUND
    GROUP BY HEAP_SEQ
  )
,STAT AS
  (
    SELECT 
      T.HEAP_SEQ 
     ,NVL(LT.STATUS,'WAIT') AS STATUS
     ,LRL.ROUND_SEQ
     ,COUNT(1) CNT
    FROM BWTA_TASK T 
    JOIN LRL ON LRL.HEAP_SEQ=T.HEAP_SEQ 
    LEFT JOIN BWTA_LOG_TASK LT ON LT.TASK_SEQ=T.SEQ AND LT.ROUND_SEQ=LRL.ROUND_SEQ
    GROUP BY T.HEAP_SEQ 
     ,NVL(LT.STATUS,'WAIT')
     ,LRL.ROUND_SEQ
   )
,L1 as(   
    SELECT 
       H.SEQ   AS HEAP_SEQ
      ,H.ID    AS HEAP_ID
      ,H.NOTE  AS HEAP_NOTE
      ,LR.START_DT
      ,LR.END_DT
      ,S.STATUS
      ,S.CNT
    FROM BWTA_HEAP H
    JOIN STAT S ON S.HEAP_SEQ=H.SEQ
    JOIN BWTA_LOG_ROUND LR on LR.SEQ=S.ROUND_SEQ  
)
Select * from L1
PIVOT
(SUM(CNT) FOR STATUS IN (
  'DONE' AS Done_cnt
 ,'WAIT' AS Wait_cnt
 ,'ACTIVE' AS Active_cnt
 ,'SUSPEND' AS Suspend_cnt
 ,'ERROR' AS Error_cnt
 ,'SKIP' AS Skip_cnt
))

HEAP_SEQ HEAP_ID HEAP_NOTE START_DT END_DT DONE_CNT WAIT_CNT ACTIVE_CNT SUSPEND_CNT ERROR_CNT SKIP_CNT ---------- ---------- ------------------------ ------------------- ------------------- ---------- ---------- ---------- ----------- ---------- ---------- -1 DEFAULT Default batch process 29.06.13 17:33:06 4 3


List of remaining tasks

SELECT 
  TASK_ID 
, EFFECTIVE_DATE 
, STATUS 
, to_char(START_DT,'DD.MM.YYYY HH24:MI:SS') AS START_DT 
, to_char(END_DT,'DD.MM.YYYY HH24:MI:SS') AS START_DT 
, END_DT 
, MINUTES 
, AVG_MINUTES 
, PREDECESSOR_TASKS 
, BLOCKING_TASKS 
FROM BWTA_V_LOG_TASK_WIDE 
where HEAP_SEQ=-1
AND NVL(STATUS,'#') not in ('DONE','SKIP')
ORDER BY  
  CASE STATUS WHEN 'ERROR' THEN 1  
              WHEN 'SUSPEND' THEN 2 
              WHEN 'ACTIVE' THEN 3 
              ELSE 4 
  END  
, TASK_ID  


Active operational tasks:


Wake up sleeping threads
(after change of metadata)

Begin
  BWTA_OPER.WakeupThread;
  commit;
End;
/


Stop workflow
Stops run new processes, keeps current processes to be finished

Begin
  BWTA_OPER.stop;
End;
/


Restart of workflow after stop

Begin
  BWTA_OPER.ReleaseThreads;
End;
/


Remove inconsistence between system and metadata
check orphans

Begin
  BWTA_OPER.checkOrphans;
End;
/


Add threads into processing
number of additional threads should be specified

Begin
  BWTA_OPER.addThreads(<number of threads>);
End;
/


Reduce number of threads
Deletes required number of sleeping threads. If there is not enough sleeping threads next will be marked with the STOP command.

Begin
  BWTA_OPER.remThreads(<number of threads>);
End;
/


Success story of mentioned solution:
Despite it seems sofisticated parallelizing solutions are domain of stable ETL processes more than one time migration processes, we used it for one time migration of historical data from 4 country-based sites. Challenge of the migration was, the data we migrated slightly differed in time and slightly differed between particular sites.
Migration processes had been developed and tested on samples of data so run-time problems was expected and there was just limited frame of time to migrate all the data history.
Implementing mentioned SIMPLETASK solution in heavy parallel mode the effect of failover resulted in following result:
  • Two developers permanently solved problems of data inconsistencies, what would be show stopper in most other situations
  • Failover effect of Simple task caused not a single minute has been lost on the critical path of the migration


Despite I consider it almost incredible, if you decide to remove the solution from your system, I add a script to drop all the created database object belonging to SIMPLETASK solution above.

Script: Drop_scheduler_solution.sql

Drop package BWTA_METADATA;
Drop package BWTA_OPER;
Drop package BWTA_THREAD;
Drop table BWTA_HEAP cascade constraints;
Drop table BWTA_TASK cascade constraints;
Drop table BWTA_TASK_REL cascade constraints;
Drop table BWTA_RES cascade constraints;
Drop table BWTA_TASK_RES cascade constraints;
Drop table BWTA_ERR cascade constraints;
Drop table BWTA_LOG_ROUND cascade constraints;

...more
Ludek Bob Jankovsky
All Right Reserved © 2007, Designed by Bob Jankovsky